Find Transmission Parts Flange, Transmission Parts Sleeve, Sleeve For Construction Machinery on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Fitting Part > OEM Precised Transmission Parts Sleeve for Construction Machinery

OEM Precised Transmission Parts Sleeve for Construction Machinery

Basic Info

Model No.:  Customized

Product Description

Model NO.: Customized Certification: CE, RoHS, SGS, ISO9001 Customized: Customized Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery Surface Treatment: Customized other: More Than 17 Year′s Experience′s for Machining. Transport Package: Carton Box Then on Wooden Crate or According to Th Origin: China Condition: New Standard: DIN, JIS, ANSI Material: Metal Colour: Customized Delivery Date: 25 Days Trademark: CZ Gear/OEM Specification: Customized Product Description
 
Customized Steel Sleeve 

OEM Precised Transmission Parts Sleeve for Construction Machinery

1. Description
 
Specification Customized
Type   Sleeve
Material  45#,C8620,SUS304,20CrMnTi etc.
Treatment Heat treatments, Carburizing, Polishing
Standard ISO 6
Delivery Date 15-20 days for samples(1-20pcs), 25-30 days for production(100-500pcs)


2. Our Product Range
 
Material Carbon Steel SAE1020, SAE1045, Cr12, 40Cr, Y15Pb, 1214L.
Alloy Steel 20CrMnTi, 16MnCr5, 20CrMnMo, 41CrMo, 17CrNiMo5...
Brass/Bronze   HPb59-1, H70, CuZn39Pb2, CuZn40Pb2,C38000, CuZn40
Machining process Gear Hobbing, Gear Milling,  Gear Shaping,  Gear Broaching,  Gear Shaving, Gear Grinding and Gear Lapping
Accuracy DIN Class 4, ISO/GB Class 4, AGMA Class 13, JIS Class 0
Heat treatment Quenching & Tempering, Carburizing & Quenching, High-frequency Hardening, Carbonitriding...
Surface treatment Blacking, Polishing, Anodization, Chrome plating, Zinc plating, Nickel plating...
 
 
3. Scope of Supply

a) Dimension report 
b) Profile report 
c) Chemical treatment report 
d) Material certificate 


4.Delivery Time
 
Samples:
Samples quantity 1-10pcs
Samples delivery date 15-20 days
Mass Orders:
100pcs -500pcs 15-20 days
500pcs-1000pcs 30 days
5Kpcs 45 days
Packaging:
Inner packing Blister box
Outer Packing Standard cartons

5. Our Services

a) OEM: According to your drawings and samples requirements.
b) Small order is accepted.
c) High precision.
d) Comprehensive and efficient after-sale service


OEM Precised Transmission Parts Sleeve for Construction Machinery
OEM Precised Transmission Parts Sleeve for Construction Machinery
 

Contact us if you need more details on Transmission Parts. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Sleeve、Steel. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Fitting Part